INFS6071 Project Management in Business
Project Management in Business
Hello, dear friend, you can consult us at any time if you have any questions, add WeChat: THEend8_
INFS6071 Project Management in Business
Individual assignment
General instructions
There are two parts to the assignment. To undertake the assignment, students should follow the
instructions below:
• The maximum length of the assignment is 2000 words comprising 1600 words for Part
1 and 400 words for Part 2. You can exceed the word count by 10% for each part.
The length of document does not include cover page, list of references and table of
contents.
• Final report submission: The report should be submitted via Canvas by due date. Please
include course name, title of the report and student ID on the front page (cover page) of
the submission. The link for the submission can be found on Canvas in the Assessment
section. You should name the submission file as follows: SID.pdf, e.g. 123456.pdf.
Please note that you SHOULD NOT provide name (first name or family name) in the
assignment document.
• Please submit the assignment as a pdf file.
• Use Arial font, size 11 points.
• Use 1.5 spacing.
• Use A4 paper and portrait orientation.
• Proof-read and sense-check your report before submitting it.
• Use the Business School Referencing Guide (APA 6th or 7th edition is fine).
• Please see marking guidelines on pages 4-6 of this document.
• IMPORTANT: You can submit the assignment only once! Please make sure that the file
that you submit is the final version.
Part 1 (24 marks)
Requirements
Then analyse the findings on the “WA’s transition to the NDIS” project from the perspective of the
formal project management methodology, PMBOK6 (i.e. PMBOK 6th edition).
Based on your analysis, respond to the following questions:
2
1. Where and how there is evidence of such a methodology being applied and its contribution.
Please provide your answer in the form of a table outlining the relevant PMBOK knowledge
areas, evidence of application, and contribution. (6 marks)
2. Where and how such a methodology might have helped avoid or mitigate identified
problems. Please provide your answer in the form of a table outlining the relevant
knowledge areas and PMBOK processes that could have been applied. Give concrete
examples of what kind of tools and techniques could have been applied. (10 marks)
3. If there were problems that appear to be outside the scope of PMBOK, discuss these
problems. Conduct your own academic research and research about the project to
provide ideas on how these problems could have been mitigated. (8 marks)
General requirements:
• Clear, well-structured and written presentation that captures the major aspects of the report
in a succinct manner.
• Consider all aspects of PMBOK and apply those that are relevant. Please use PMBOK 6th
edition. Do not use PMBOK 7th edition.
• Conduct your own research to support your arguments and to understand the project context.
• Apply a structure to each section of your report to guide the reader and demonstrate you
have applied a comprehensive and systematic approach.
• You are required to use third-party references to support your arguments for question 3
above.
A useful starting point for online research is Google Scholar, scholar.google.com. If you are
working off-campus you can access Google Scholar from the university library web page and
access articles and other resources
Remember the instructions for scientific writing, particularly referencing!
Part 2 (6 marks)
Application of analytical techniques in professional project management
Critical Path Analysis
Axis Corporation is an innovative firm. Leveraging on its capabilities in adopting artificial
intelligence to meet customer needs, the firm has recently designed a new model of “intelligent”
vacuum cleaners. You are asked to lead a marketing campaign for the new product. Axis will be
a new entrant to the vacuum cleaner market which is highly competitive. Details of activities
involved in the project are given in the following table.
Activity
ID
Activity Predecessor Estimated
duration (days)
1 Get budget for the
campaign approved
5
2 Select campaign staff 1 3
3 Train campaign staff 2 3
4 Develop alternative
marketing themes
1 8
5 Evaluate and select the
marketing theme
3, 4 5
6 Produce the campaign
material
5 12
7 Get the campaign material
approved
6 3
8 Select the communication
channel
5 4
9 Launch campaign 7, 8 3
3
4(a) Draw a network diagram using the activity on node (AON) notation representing the
project. What is the critical path and how long is it? You may use PowerPoint to draw
the diagram and then copy it into your assignment document. You should not use
Microsoft Project or any other project management software for this part of the
assignment. (4 marks)
4(b) In the context of the above project, explain key benefits in managing a project using
critical path. Please use appropriate references to support your explanation. (2 marks)
Presentation requirements for Q4(a)
• Prepare network diagram for the project including identification and measurement of
critical path – including evidence of having performed a forward and backward pass (i.e.
include your workings, for example, in the form of a table).
• Make sure you identify the critical path and its duration in your answer.