Hello, dear friend, you can consult us at any time if you have any questions, add WeChat: THEend8_
ELEC 3105 - Electrical Energy
Assignment
INTRODUCTION
Assignments must be submitted as a single (either .doc, .docx or .pdf file) in a properly formatted document.
An appropriately prepared document (using Word, LaTeX etc) is strongly suggested. Handwritten assign-
ments in a digital device are also acceptable but will have to be legible. Scanned copies or photographs
of A4 pages of handwritten solutions will not be accepted or marked.
This assignment contributes 13% toward your final marks.
The last day of submitting the assignment is 11.59pm, Sunday, 17th July 2022 via the Turnitin Assignment
submission link in Moodle:
Late submission will not be permitted under any circumstances. Submission via email attachment will also
not be considered.
Since this assignment counts towards your formal assessment for this subject, you are required to sign a
declaration and attach it as a cover sheet to the front of your submission. Without this signed declaration,
the assignment will not be considered for assessment. A fillable pdf file for signed declaration can be found
in Moodle.
Note that plagiarism (i.e. copying of assignment or pay someone to do your assignment) is an academic
offence. If suspected of plagiarism, you may be referred to disciplinary board and will be subjected to heavy
penalties.
LEARNING OUTCOMES AND GRADUATE ATTRIBUTES
This assignment covers the first three topics of ELEC3105; Energy generation, Three-phase systems and
Transformers.
The key learning outcomes of the activity are:
• Develop the capacity to select, design and justify important power engineering devices for real-life
applications,
• Be able to apply underlying theories and concepts in the design process.
The key graduate attributes linked to the activity are:
• Analytical skills, critical thinking and creative problem solving.
• Demonstration of the understanding of principles.
• Effective use and communication of relevant information.
1
ASSIGNMENT TASKS [TOTAL OF 100 MARKS + 11 BONUS MARKS]
It’s January 2023.
The crypto-crash of mid-2022, followed by the crypto-crash of late 2022 and the great iceberg lettuce
shortage means that previously "profitable mining and donkey NFT businesses" have now pitched to also
cultivate leafy green vegetables in greenhouses heated by the stacks of graphics cards.
You have been assigned by your electrical engineering services company to investigate the power supply
issues at one such facility, known as "Sneed’s Fine Mine, Dine & Wine" (formerly Chuck’s).